2026 Estimator Planning Assumptions

The default starting rates and example sizes behind 16 ProjectCostWise home-project categories. We chose these editable assumptions for planning examples; they are not measured national or local prices. Use local written quotes when available.

HOW TO READ THIS DATA

Standard-complexity planning examples

Each row uses the ProjectCostWise default project size, the current editable low and high cost-per-square-foot assumptions, and the 1.00× standard-complexity multiplier. The result is a planning range only. It is not a local quote, appraisal, market survey or promise of what a contractor will charge.

2026 estimator assumptions

ProjectExample sizeStarting ratePlanning range
Kitchen remodel200 sq ft$150–$300/sq ft$30,000–$60,000
Bathroom remodel80 sq ft$120–$250/sq ft$9,600–$20,000
Primary bathroom remodel120 sq ft$150–$300/sq ft$18,000–$36,000
Whole-home interior remodel2,000 sq ft$100–$250/sq ft$200,000–$500,000
Basement finish or remodel1,000 sq ft$50–$150/sq ft$50,000–$150,000
Attic finish or remodel600 sq ft$60–$180/sq ft$36,000–$108,000
Garage remodel500 sq ft$30–$100/sq ft$15,000–$50,000
Laundry room remodel80 sq ft$50–$140/sq ft$4,000–$11,200
Home or room addition300 sq ft$150–$350/sq ft$45,000–$105,000
Roof replacement2,000 sq ft$5.50–$11/sq ft$11,000–$22,000
Siding replacement1,800 sq ft$8–$20/sq ft$14,400–$36,000
Deck build or replacement300 sq ft$25–$60/sq ft$7,500–$18,000
Concrete slab or patio400 sq ft$8–$15/sq ft$3,200–$6,000
Flooring installation1,000 sq ft$4.50–$10/sq ft$4,500–$10,000
Interior painting1,000 sq ft$1.80–$3.20/sq ft$1,800–$3,200
Drywall installation or repair500 sq ft$2.50–$6/sq ft$1,250–$3,000

What this dataset is—and is not

The figures are the current default assumptions built into the ProjectCostWise estimator for these project types. They are intended to make the calculator transparent and give homeowners a reproducible planning baseline. They should not be represented as observed national averages, contractor-bid medians or government statistics.

Real projects can differ materially because of geography, labor availability, materials, demolition, permits, access, hidden conditions, design changes and contractor scope. ProjectCostWise currently does not apply an automatic ZIP-code price multiplier; users can edit the rate assumptions before calculating.

How to use or reference this table

You may refer to these as ProjectCostWise estimator defaults and link to this page. Always include the example size and state that the rates were internally selected for planning; they are not observed contractor prices or independent market research.

DATA ACCESS

Download the estimator assumptions

The CSV contains the project name, default size, low and high rate assumptions, standard-complexity multiplier, resulting planning range and related guide URL.

Download CSV

What would make these rates stronger

These defaults have not been calibrated against a published sample of contractor bids. A future update should document the source, date, geography and scope of any real quote data, separate observed prices from modeled examples, and explain how outliers are treated. Until then, adjust the inputs using your own local written proposals.

Published: September 11, 2026 · Clarified: October 1, 2026